Size: 189,746 sq.ft./17,349 sq.m.
Delivery Method: Construction Management
Collaborators: HIP Architects, Stantec Constulting Ltd.
This project covered the construction of work areas for the process and transfer of roughly 450,000 tons of waste and recyclable material per year. This included a tipping floor, pre-process area and refuse derived facility. The main building, supplied and erected in partnership with the Clark Builders Metal Buildings division, has a clear span at the transfer floor of over 215 ft. Due to waste process requirements, extremely tight concrete tolerances were required and successfully met.