Project Details

Size: 117,456 sq.ft./10,912 sq.m.

Delivery Method: Design-Build, Lump Sum

Collaborators: Stantec Consulting Ltd.

Project Description

This project, a part of the Alberta Schools Alternate Procurement (ASAP) III P3 Design-Build School project, combined a public elementary and junior high school, and an elementary Catholic school all within one structure. Certified LEED® Gold, the design consists of a conventional permanent core with capability for additional high performance modular classrooms to be added or removed depending on student enrolment.

The building features concrete foundations, load-bearing masonry and structural steel base construction with brick veneer and stucco finishing. All exterior cladding and cementitious siding was self-performed by Clark Builders. This incorporated the use of an air-vapour barrier membrane, Roxul CavityRock insulation and a galvanized Subgirt System.

How can we help?

Are you interested in finding out how Clark Builders can make your project a success? For more information on our services please email us.

Send an E-mail