Size: 3,314 sq.ft./307.8 sq.m.
Delivery Method: Fixed Price
Collaborators: Mount Royal University
The Leacock Theatre renovation project included the full demolition of the existing tiered stage seating and substructure down to the concrete structure. The tiered stairs and flooring were then reconstructed to support the installation of new theater seating was completed. Also included was the complete removal of existing stage finishes and the installation and finishing of all new hardwood for the stage, along with the addition of structural steel elements to support stage seating as well as stage area that was expanded.
One key component of the project was the installation of all new lighting for the theatre seating. Integrated and coordinated with the flooring installation, much of the lighting was installed within the flooring for directional safety. Additional components of the project included extensive millwork detailing for the updated stage, custom wood railing systems to suit the stage access stairs, refreshed painting and the installation of new acoustic fabric paneling throughout the theater.
Are you interested in finding out how Clark Builders can make your project a success? For more information on our services please email us.
Send an E-mail