Size: 105,181 sq.ft./9,771 sq.m.
Delivery Method: Construction Management
Collaborators: BEI Engineering (2000) Inc., Designcore Engineering Ltd., HCI Architecture Inc., Lawson Projects, S2 Architecture
This project consisted of a post-flood restoration to the Big 4, Stampede Headquarters and People Centre buildings. A key driver in this project was the successful management of construction and events schedules, which ran simultaneously throughout the project lifecycle.
In the Big Four building, exhibition space needed rehabilitating and renovations were carried out to the mezzanine level. Electrical infrastructure was rebuilt and new data and communication systems installed.
Within the Headquarters building, interior demolition was required to remove materials damaged by floodwater before renovation and restoration services could be performed. Throughout the design development process, Clark Builders was involved in a value-add capacity.
Are you interested in finding out how Clark Builders can make your project a success? For more information on our services please email us.
Send an E-mail