City of Edmonton Solar PV Construction Management

Edmonton, Alberta

Project Description

To address the City of Edmonton's greenhouse gas emissions and sustainability targets, Clark Builders’ Alternative Energy team was contracted to oversee the construction of five solar energy projects at various city sites. The projects included the Pilot Sound Fire Station, Lewis Farms Fire Station, Ellerslie Fire Station, Engineering Services Building, and Centennial Transit Facility.

In 2021, the Clark Builders team diligently managed the entire process, starting from tendering engineering and design services. To streamline the design approval process, we utilized a program called HelioScope to develop comprehensive designs for each facility. This approach allowed us to accurately model the anticipated solar energy generation, resulting in simplified design approval.

After obtaining the necessary approvals, we assumed responsibility for the construction and commissioning phases for all five sites. To ensure transparency and fairness, we conducted a public tender process to select qualified installation subcontractors.

The portfolio of solar installations comprises ballasted rooftop systems and a wall-mounted array. These installations are projected to collectively generate up to 700 MWh of energy annually. This significant contribution to renewable energy will assist the City of Edmonton in reducing its carbon footprint and achieving its sustainability objectives.

  • Client

    City of Edmonton

  • Delivery Method

    Construction Management

DISCOVER MORE

Fort Chipewyan Solar Farm

Fort Chipewyan Solar Farm

Clark Builders installed a 2.2 MW solar array in Fort Chipewyan, relying on ice roads to transport materials during a small window of opportunity, ...
Tahera Diamond Mine

Tahera Diamond Mine

Clark Builders constructed various buildings, including a process plant, emulsion building, and maintenance building, among others, utilizing ...
Diavik Diamond Mine

Diavik Diamond Mine

Clark Builders erected various pre-built modular and pre-engineered buildings, including a water treatment facility, ammonia nitrate storage ...
Old Crow Battery Energy Storage System and Microgrid Controller Project

Old Crow Battery Energy Storage System and Microgrid Controller Project

Clark Builders installed a battery energy storage system and microgrid controller in Old Crow, Yukon to reduce dependence on fossil fuels and offset ...
Albian Central Warehouse

Albian Central Warehouse

Clark Builders constructed a 7,396 sq. m centralized warehouse with a single-storey warehouse and a single-storey office for a major exploration and ...
Edmonton International Airport Cogeneration Units

Edmonton International Airport Cogeneration Units

Clark Builders installed electrical components for a new switchgear room and foundations for an E-Building and three CHP generators at the Edmonton ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.