Skip to main content

IBM Leadership Data Centre

Barrie, ON

Project Description

The IBM Leadership Data Centre is a highly resilient, mission-critical facility designed to support Strategic Outsourcing and Business Continuity and Recovery Services for IBM’s customers. Built to IBM Level III+ standards, the facility delivers secure, reliable infrastructure to meet demanding operational requirements.

The initial phase included 25,000 square feet of white space, with 15,000 square feet enabled at 100 watts per square foot. The facility also incorporates purpose-built office, administration, and support areas to accommodate shipping and receiving, maintenance, security, and operational circulation.

The data centre features dual utility electrical feeds, emergency diesel power generation, and uninterrupted power supply systems configured for N+1 redundancy. Mechanical systems include a water-cooled chiller plant with a waterside economizer, also designed with N+1 redundancy to ensure continuous performance.

A subsequent tape room conversion added a high-density data hall, increasing capacity with approximately 100 cabinets and 500kW of IT load. Together, these elements create a future-ready data centre focused on reliability, scalability, and operational excellence.

  • Client

    IBM

  • Size

    118,000 sq.ft.

  • Architect

     Gensler 

  • Delivery Method

     Construction Management 

DISCOVER MORE

Fort McKay Community Centre

Fort McKay Community Centre

The Fort McKay Community Centre, a vibrant space for cultural events, built with local engagement and sustainable practices, reflecting the ...
Fort McKay Youth Centre

Fort McKay Youth Centre

The Youth Centre is a remarkable accomplishment that showcases a modern facility with contemporary architecture and an impressive exterior plaza ...
Esker Art Gallery

Esker Art Gallery

Located atop the prominent Atlantic Avenue Art Block, which Clark Builders completed in 2012, in Calgary’s famed Inglewood district, the Esker ...
St. Josaphat Ukranian Catholic Parish Restoration

St. Josaphat Ukranian Catholic Parish Restoration

The St. Josaphat Ukrainian Catholic Church underwent exterior restoration, including masonry, roofing, painting, and wood dome repairs, with the ...
Stanley Milner Library

Stanley Milner Library

Originally built in the 1960s, the Stanley A. Milner Library renewal consisted of removing the existing library façade and installing a new cladding ...
Salt River First Nation Multipurpose Facility

Salt River First Nation Multipurpose Facility

The Salt River First Nation Multipurpose facility was designed and constructed to provide an iconic feature on the main street, which reflects the ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.