Skip to main content

Issoitapi Elementary School

Kainai Nation

Project Description

Located just north of the former school on Kainai Nation, a proud signatory to Treaty 7, the new Issoitapi Elementary School embodies a commitment to flexible learning environments and deep alignment with Blackfoot culture. The school accommodates 517 students and includes specialized spaces such as a cultural wing with a ceremony room and greenhouse, a large mass timber gymnasium, and adaptable learning clusters. Accessibility was prioritized throughout, with barrier-free pathways, universal washrooms, and an elevator servicing all key levels.

From the outset, community voices shaped the design. Parents and students took part in workshops to help develop a vision true to the needs and aspirations of the Kainai people. The result is a space rooted in Kainai traditions, Blackfoot values, 21st-century learning, and land-based connections.

Constructing the school’s angular, culturally significant design required precision and collaboration. A key challenge was routing HVAC, sprinklers, and plumbing systems through exposed mass timber rooflines while preserving architectural intent. Working closely with trade partners, the team developed solutions that were both functional and visually educational. Building systems were intentionally left exposed and colour coded, transforming the school into a “3D textbook” for students.

To support long-term sustainability, a closed-loop geothermal field with 30 boreholes, each reaching 500 feet deep was installed to provide efficient heating and cooling as the building’s primary energy source.

Clark Builders is honoured to have partnered with the Kainai Nation to bring this inspiring vision to life through thoughtful planning, meaningful engagement, and quality craftsmanship.

  • Client

    Kainai Board of Education

  • Architect
    Reimagine
  • Size

    66,144 sq.ft.

  • Delivery Method

    Construction Management

DISCOVER MORE

Productivity and Innovation Centre

Productivity and Innovation Centre

The Productivity and Innovation Centre (PIC) at the Northern Alberta Institute of Technology (NAIT) is a cutting-edge facility designed to enhance ...
JH Sissons School

JH Sissons School

JH Sissons New School is a two-storey steel structure that was built over the same footprint of the original school, accommodating up to 572 people, ...
Centre for Applied Technology

Centre for Applied Technology

The visually stunning Centre for Applied Technology accommodates up to 1,700 students, offering advanced classrooms, simulation labs, and a 135-seat ...
Clear Water Academy Replacement

Clear Water Academy Replacement

Clark Builders constructed a new three-storey academy, featuring a rotunda entrance, a chapel with a unique cross, and specialty rooms, for the Clear ...
Elsie Fabian School

Elsie Fabian School

The new Elsie Fabian School in Fort McKay is a 60,000 square foot architectural showpiece for the First Nation, integrating with existing facilities ...
Escuela Mill Creek School

Escuela Mill Creek School

The new replacement school services K-6 students, with a collaborative team and environmental considerations, featuring a bird’s nest learning ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.