Skip to main content

Red Deer Polytechnic Alternative Power Initiative and Alternative Energy Lab

Red Deer, Alberta

Project Description

The Red Deer Polytechnic Alternative Power Initiative and Alternative Energy Lab included the installation of up to three Mega Watts (MW) of grid-tied alternative power as well as the construction of a new interactive learning lab. The lab is an open, flexible working space with a large mezzanine for storage, and the integrated alternative energy technologies are expected to offset an estimated two-thirds of the institute’s annual electrical consumption.

The Alternative Energy Initiative produces up to three MW of electricity –  one MW is generated from Combined Heat and Power (CHP), and two MW are generated with rooftop and ground-mounted solar cells. The building also features all LED lighting, including an LED lighting retrofit on the building’s exterior.  

Throughout the process, Clark Builders went beyond designing and building the lab with alternative energy sources, and provided consultation and assistance on grant and rebate programs to offset the project costs. With an estimated 5,000 tones in Greenhouse Gas savings—equivalent to eliminating the emissions of about 1,100 vehicles—this project is leading the way in sustainable energy buildings. 

  • Client

    Red Deer Polytechnic

  • Architect

    Manasc Isaac Architects Ltd.

  • Delivery Method

    Design Build

DISCOVER MORE

Powell Canada

Powell Canada

The Powell Canada project includes a two-phase construction plan with Phase I consisting of a switchgear and pre-fabricated electrical room ...
Red Deer Polytechnic Alternative Power Initiative and Alternative Energy Lab

Red Deer Polytechnic Alternative Power Initiative and Alternative Energy Lab

The Red Deer College Alternative Power Initiative involves installing up to 3 MW of grid-tied alternative power, constructing a new learning lab, and ...
Edmonton International Airport Cogeneration Units

Edmonton International Airport Cogeneration Units

Clark Builders installed electrical components for a new switchgear room and foundations for an E-Building and three CHP generators at the Edmonton ...
Fort Chipewyan Solar Farm

Fort Chipewyan Solar Farm

Clark Builders installed a 2.2 MW solar array in Fort Chipewyan, relying on ice roads to transport materials during a small window of opportunity, ...
City of Edmonton Solar PV Construction Management

City of Edmonton Solar PV Construction Management

Clark Builders managed design and installation of 5 solar PV systems for the City of Edmonton, with 3 operational systems at fire stations, featuring ...
Old Crow Battery Energy Storage System and Microgrid Controller Project

Old Crow Battery Energy Storage System and Microgrid Controller Project

Clark Builders installed a battery energy storage system and microgrid controller in Old Crow, Yukon to reduce dependence on fossil fuels and offset ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.