Skip to main content

Escuela Mill Creek School

Edmonton, Alberta

Project Description

The new two-storey replacement school services a student population of 350-400 in grades K-6. Utilizing an Integrated Project Delivery model, this project leveraged a highly collaborative project team to deliver educational value to the client. The result was an environment that meets 21C learning objectives, celebrates Spanish culture, and nurtures the Mill Creek community. This unique school features a bird’s nest learning commons, a full community daycare and fine arts studios. As a highly collaborative project, this school was constructed with the whole community’s needs in mind, and their feedback was used in the design.

Environmental and energy best practices played a large part in the design of this school. Students can monitor the activity of the 300 solar panels mounted on the school’s south-facing walls, as well as their school’s energy consumption. Three sensors on the roof tilt the panels for maximum sun exposure. These panels are also visible from the inside of the school.

The use of an Integrated Project Delivery Model allowed the team to address the initial budget and schedule challenges using Target Value Design and Last Planner® System. Early collaboration between the contractor and consultant groups ensured that the owner’s satisfaction was met and the educational value was prioritized throughout the project life cycle.

The ambitious design of this school required the use of Target Value Design to arrive at a cost-effective solution that was in keeping with the architectural vision. Targeted areas included the building exterior finishes, landscaping and paving, the suspended birds nest, and central stair design.

  • Client

    Edmonton Public School Board

  • Architect

    Manasc Isaac Architects

  • Size

    38,467 sq.ft.

  • Delivery Method

    Integrated Project Delivery

DISCOVER MORE

Robert G. Kuhn School of Business

Robert G. Kuhn School of Business

Trinity Western University’s Robert G Kuhn School of business will be a four-storey structure with natural heavy timber and steel, featuring ...
University Commons

University Commons

The $100M DentPharm project includes renovating the historic 1922 Dentistry Pharmacy building, demolishing the East, West, and North wings, ...
Red Crow Community College

Red Crow Community College

Red Crow Community College, located on the Kainai First Nation on the Blood Reserve in Southern Alberta is a pioneering post-secondary institution. ...
Escuela Mill Creek School

Escuela Mill Creek School

The new replacement school services K-6 students, with a collaborative team and environmental considerations, featuring a bird’s nest learning ...
St. Lorenzo Ruiz School

St. Lorenzo Ruiz School

Clark Builders is engaged in an IPD framework with Group 2 Architecture for a new school in Kentwood, aimed at accommodating up to 735 students and ...
Crowfoot School

Crowfoot School

Clark Builders constructed the Siksika Crowfoot Elementary School, featuring cultural elements and cost-saving options, with a steel frame, concrete ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.