Project Description

The JH Sissons New School project is a brand new school that was built over the same footprint of the original school, which has been demolished. It is a two-storey steel structure with an exterior envelope system and exterior siteworks and concrete. The facility is 46,919 square feet with 18 classrooms, a gymnasium, and a library. It can accommodate up to 572 people. Temporary portable classrooms were installed to accommodate the classes while construction was taking place.

An Indigenous consultant was brought in to provide insights on the facility’s design. Elements such as circular spaces, wayfinding, and culturally significant colour palates were incorporated into the building’s design.

Shortly after starting the project it was discovered that there was a 4.5 meter void under the centre of the school that had not been shown on the geotechnical information taken from around the existing school. This was handled by implementing an increased blasting program, and filling the remaining void with concrete. Revising the siteworks and dropping the main floor elevation by 1.5 meters not only benefited the geotechnical footprint below, but also improved the accessibility of the school.

A significant value to this project was our self-performing the cladding on the school. We first installed an exterior wall consisting of a Torch-On Air Vapour Barrier Membrane, 2 Layers of Mineral Wool Insulation, Full Depth Thermal Clips & related Galvanized sub-girts. This ensured a smooth transition between the profiled prefinished steel, phenolic panel, and fibre cement plank material that made up the cladding.

  • Client

    Government of the North West Territories

  • Architect

    Stantec Architecture Ltd.

  • Size

    43,647 sq.ft.

  • Delivery Method

    Lump Sum

DISCOVER MORE

Centre for Applied Technology

Centre for Applied Technology

The visually stunning Centre for Applied Technology accommodates up to 1,700 students, offering advanced classrooms, simulation labs, and a 135-seat ...
Red Crow Community College

Red Crow Community College

Red Crow Community College, located on the Kainai First Nation on the Blood Reserve in Southern Alberta is a pioneering post-secondary institution. ...
Kihew Waciston Indigenous Centre

Kihew Waciston Indigenous Centre

The kihêw waciston Indigenous Centre located at MacEwan University, is a new space on the growing downtown Edmonton campus.
Robert G. Kuhn School of Business

Robert G. Kuhn School of Business

Trinity Western University’s Robert G Kuhn School of business will be a four-storey structure with natural heavy timber and steel, featuring ...
Allard Hall

Allard Hall

Allard Hall is a five-story building with performance spaces, galleries, classrooms, labs, and offices that serves as a hub for visual and performing ...
Northern Lakes College

Northern Lakes College

The Northern Lakes College High Prairie Campus is a LEED Silver certified two-storey building that features open spaces, natural decor, and rooms for ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.