Skip to main content

Kihew Waciston Indigenous Centre

Edmonton, Alberta

Project Description

The kihêw waciston Indigenous Centre located at MacEwan University, is a new space on the growing downtown Edmonton campus. The existing space was located in the Robbins Health Learning Centre and due to capacity and space constraints required selective demolition to accommodate the new desired size and layout. An interior tenant improvement was undertaken to provide students a dedicated space to access personal, academic, financial, and cultural support. The space contains open gathering spaces, offices, washrooms, and a residential style kitchen.

From the outset, Elders and knowledge keepers were deeply involved and invested in the outcome of the project and space provided for the students. The team constructed canted and curved gathering room walls that resemble tipi formation, custom acoustic panels to control sound transmission during cultural events, directional wood flooring, and appropriate color coordination to tie in the Treaty 6 emblem design. The entrance features custom vinyl student artwork, wood double doors with "carvings" etched into the face, and a unique basalt stone/millwork reception desk.

The washrooms were renovated to be gender-neutral, and a new kitchen was built featuring millwork and a wood slab from a tree that is thousands of years old. During the renovation, black mold was discovered, so abatement procedures were carried out before continuing construction.

Additionally, landscaping and outdoor elements were incorporated such as a firepit and tipi space, installation of a 14,000 pound stone mother bear sculpture praying for earth’s healing—the university’s Treaty 6 marker, along with surrounding trees and shrubs native to the area. Clark Builders' attention to detail and cultural sensitivity ensured the successful completion of this unique project.

  • Client

    MacEwan University

  • Architect

    DIALOG

  • Size

    6,000 sq.ft.

  • Delivery Method

    Construction Management

DISCOVER MORE

St. Lorenzo Ruiz School

St. Lorenzo Ruiz School

Clark Builders is engaged in an IPD framework with Group 2 Architecture for a new school in Kentwood, aimed at accommodating up to 735 students and ...
JH Sissons School

JH Sissons School

JH Sissons New School is a two-storey steel structure that was built over the same footprint of the original school, accommodating up to 572 people, ...
Crowfoot School

Crowfoot School

Clark Builders constructed the Siksika Crowfoot Elementary School, featuring cultural elements and cost-saving options, with a steel frame, concrete ...
Red Crow Community College

Red Crow Community College

Red Crow Community College, located on the Kainai First Nation on the Blood Reserve in Southern Alberta is a pioneering post-secondary institution. ...
Heritage Hills Elementary School

Heritage Hills Elementary School

This LEED Silver Certified K-6 school in Sherwood Park has room for over 650 students and features interactive spaces, a central corridor, an outdoor ...
Centre for Applied Technology

Centre for Applied Technology

The visually stunning Centre for Applied Technology accommodates up to 1,700 students, offering advanced classrooms, simulation labs, and a 135-seat ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.