Skip to main content

Operations Smelter Recycling Building

Trail, British Columbia

Project Description

Clark Builders successfully completed the design-build contract for the Smelter Recycle Building located at Teck Trail Operations' brownfield site. 

The primary objective of the project was to develop a facility that would effectively reduce fugitive dust emissions in the Beach area of Teck Trail Operations. 

The construction process involved various disciplines, including earthworks, mechanical engineering, electrical systems, pre-engineered buildings, pre-cast concrete, and cast-in-place concrete. 

The project made innovative use of pre-cast foundation walls and a frameless stress skin building, resulting in a significant reduction in the project's overall duration.

  • Client

    Teck Metals Ltd.

  • Size

    121,400 sq.ft.

  • Delivery Method

    Design Build

DISCOVER MORE

Grovedale Water Supply System

Grovedale Water Supply System

Clark Builders constructed a water treatment facility in Greenfield, utilizing reverse filtering osmosis system and self-performing the concrete ...
E.L. Smith Water Treatment Plant

E.L. Smith Water Treatment Plant

Clark Builders completed the construction of a UV facility and a sodium hypochlorite building, both of which required coordination and precise timing ...
Operations Smelter Recycling Building

Operations Smelter Recycling Building

Clark Builders successfully completed the design-build contract for the Smelter Recycle Building located at Teck Trail Operations' brownfield site.
Sandy Lake Water Treatment Plant Upgrade

Sandy Lake Water Treatment Plant Upgrade

Clark Builders completed the construction of a new building addition, generator building, and supplied and installed treatment, pumping, mechanical ...
Tallcree First Nation Waste Transfer Station

Tallcree First Nation Waste Transfer Station

Clark Builders completed civil works and construction of a garage and attendant trailer, including mechanical and electrical components, for the ...
ConocoPhillips Surmont Water Treatment Plant project

ConocoPhillips Surmont Water Treatment Plant project

Partnering with Bantrel, Clark Builders developed 10 buildings totaling 165,710 square feet to house the components of the ConocoPhillips Surmont ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.