Sandy Lake Water Treatment Plant Upgrade

Sandy Lake, Alberta

Project Description

Upgrading the Sandy Lake Water Treatment Plant required a full scope of work, from construction to demolition. To upgrade the plant, Clark Builders constructed a new 3,658 square foot building addition over a new concrete water storage reservoir and a 484 square foot generator building. 

Within the new buildings, the Clark Builders team tied into two ground water supply wells and supplied and installed treatment, pumping, mechanical, and electrical equipment — including a diesel fuel standby generator. Installing this equipment also required the addition of many new water and sewer connections. 

Once the upgraded facility was operational, the team decommissioned existing raw water and sewer connections before demolishing the existing water treatment building. 

  • Client

    Municipal District of Opportunity No.17

  • Architect

    Bullee Consulting Ltd.

  • Size

    3,658 sq.ft.

  • Delivery Method

    Lump Sum

DISCOVER MORE

Enoch Solid Waste Diversion Station

Enoch Solid Waste Diversion Station

The Enoch Cree Nation waste diversion station was a crucial infrastructure project that aimed to minimize landfill waste and establish a dedicated ...
Paul First Nation Waste Transfer Station

Paul First Nation Waste Transfer Station

Clark Builders completed the construction of a wood-framed waste shed, pre-engineered vehicle storage building, bollards, and parking curbs, along ...
Recycle and Waste Drop-Off Facility

Recycle and Waste Drop-Off Facility

Clark Builders constructed a modern Surrey Recycling and Waste Drop-off Facility, featuring a transfer building, offices, sheltered depot area, ...
Operations Smelter Recycling Building

Operations Smelter Recycling Building

Clark Builders successfully completed the design-build contract for the Smelter Recycle Building located at Teck Trail Operations' brownfield site.
Grovedale Water Supply System

Grovedale Water Supply System

Clark Builders constructed a water treatment facility in Greenfield, utilizing reverse filtering osmosis system and self-performing the concrete ...
Sandy Lake Water Treatment Plant Upgrade

Sandy Lake Water Treatment Plant Upgrade

Clark Builders completed the construction of a new building addition, generator building, and supplied and installed treatment, pumping, mechanical ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.