Sandy Lake Water Treatment Plant Upgrade

Sandy Lake, Alberta

Project Description

Upgrading the Sandy Lake Water Treatment Plant required a full scope of work, from construction to demolition. To upgrade the plant, Clark Builders constructed a new 3,658 square foot building addition over a new concrete water storage reservoir and a 484 square foot generator building. 

Within the new buildings, the Clark Builders team tied into two ground water supply wells and supplied and installed treatment, pumping, mechanical, and electrical equipment — including a diesel fuel standby generator. Installing this equipment also required the addition of many new water and sewer connections. 

Once the upgraded facility was operational, the team decommissioned existing raw water and sewer connections before demolishing the existing water treatment building. 

  • Client

    Municipal District of Opportunity No.17

  • Architect

    Bullee Consulting Ltd.

  • Size

    3,658 sq.ft.

  • Delivery Method

    Lump Sum

DISCOVER MORE

ConocoPhillips Surmont Water Treatment Plant project

ConocoPhillips Surmont Water Treatment Plant project

Partnering with Bantrel, Clark Builders developed 10 buildings totaling 165,710 square feet to house the components of the ConocoPhillips Surmont ...
Sandy Lake Water Treatment Plant Upgrade

Sandy Lake Water Treatment Plant Upgrade

Clark Builders completed the construction of a new building addition, generator building, and supplied and installed treatment, pumping, mechanical ...
Tallcree First Nation Waste Transfer Station

Tallcree First Nation Waste Transfer Station

Clark Builders completed civil works and construction of a garage and attendant trailer, including mechanical and electrical components, for the ...
Operations Smelter Recycling Building

Operations Smelter Recycling Building

Clark Builders successfully completed the design-build contract for the Smelter Recycle Building located at Teck Trail Operations' brownfield site.
E.L. Smith Water Treatment Plant

E.L. Smith Water Treatment Plant

Clark Builders completed the construction of a UV facility and a sodium hypochlorite building, both of which required coordination and precise timing ...
Grovedale Water Supply System

Grovedale Water Supply System

Clark Builders constructed a water treatment facility in Greenfield, utilizing reverse filtering osmosis system and self-performing the concrete ...