Skip to main content

Home Depot Warehouse

Balzac, Alberta

Project Description

High Plains Building 2, located in Balzac at the High Plains Industrial Park, known as Western Canada’s Distribution hub, is a “A” class dual-load distribution centre facility, and the second project for Clark Builders in the Industrial Park. 

The large-scale facility located on a 25.22-acre site involved the construction of a single-storey cross dock distribution facility with approximately 40,000 square feet of office space. 

The construction of the building involved the installation of robust structural steel, designed to withstand the rigors of heavy use and extreme weather conditions. The exterior walls of the building were constructed using a combination of precast concrete wall panels and insulated metal panels, providing excellent insulation and protection against the elements.

A key aspect of the construction involved the fit-out for end user, Home Depot, which required the installation of specialized fixtures and equipment to support the distribution and storage of a wide range of products. Our team worked closely with Home Depot to ensure that their specific requirements were met, and that the facility was fully equipped to meet their needs.

  • Client

    Lawson Projects

  • Architect

    HK Architectural Services

  • Size

    418,346 sq.ft.

  • Delivery Method

    Lump Sum

DISCOVER MORE

High Plains Warehouse Building 3

High Plains Warehouse Building 3

Clark Builders will construct a 410,000 square foot warehouse with related site work on a 23 acre site, building on their past success of delivering ...
LJ Welding

LJ Welding

Clark Builders completed a lump sum project in 2015 consisting of a Butler pre-engineered building, conventional steel and wood-frame office, four ...
Amazon Warehouse

Amazon Warehouse

The newly constructed 1,078,342 square foot Traditional Non-Sortable Facility for Amazon, is located in Calgary, reinforcing Amazon's presence in ...
ATCO Electric Distribution & Transmission Facility

ATCO Electric Distribution & Transmission Facility

The ATCO Electric Distribution and Transmission Facility in Grande Prairie includes conventional steel office structure, a Metal Buildings System ...
High Plains Warehouse Building 2 - Home Depot

High Plains Warehouse Building 2 - Home Depot

High Plains Building 2 is a large distribution facility with office space, constructed with precast concrete and insulated metal panels and later ...
Customer Fulfillment Centre Voilà

Customer Fulfillment Centre Voilà

Clark Builders manages the construction of the new Voila Customer Fulfillment Centre integrating an ASRS system with low tolerance requirements for ...

LET’S BUILD THE FUTURE OF CONSTRUCTION TOGETHER

Join us in our aspirations to create more, do more, and connect more Canadian communities than ever.